This view of the CVC site taken at the end of August 2004 shows nearly three quarters of the roof deck in place, while the installation of granite paving stones on the western half of the deck is well underway. The interior walls for the visitor screening zone can be seen in the center of the photo as well as the walls and roof of the Congressional Auditorium (center foreground). Below the roof, most of the concrete floor slabs for the CVC’s three levels have been completed and interior utility work continued to progress. The entrance structure and a portion of the base slab for the Library of Congress pedestrian tunnel is also visible to the left of the Congressional Auditorium.