2-28-05 Workers guide a steel pile into place, which will facilitate excavation of a trench for a new utility tunnel along East Capitol Street.
|
3-14-05 As excavation continues along East Capitol Street, a backhoe suspended over a temporary bridge removes soil from a trench that will eventually reach 20 feet.
|
3-28-05 Workers use shovels to facilitate the insertion of a wood plank that will help maintain the north wall of the East Capitol Street utility trench.
|
4-11-05 Along East Capitol Street, excavation work continues in a utility trench that will reach a depth of 20 feet.
|
5-9-05 A worker guides a section of a pre-cast concrete tunnel into the trench for the CVC utility tunnel along East Capitol Street.
|
5-23-05 Pre-cast concrete sections are in place along the East Capitol Street utility tunnel.
|
9-26-05 A worker helps guide a 40-foot steel pipe into place inside the CVC utility tunnel.
|  |  |