Architect of the Capitol

 
Related Links
 
  •  
  •  
     
  •  
  •  
     
     
     
     
    More Locations
     
    East Capitol Street
    East Front Extension
    Entrance
    Exhibition Gallery
    Great Hall
    LOC Tunnel
    Plaza
    Service Level
    Skylights
    Photos of the CVC East Front Extention Construction
     
    A pipe-fitter cuts a water line on the upper level of the CVC
    6-6-05 A pipe-fitter cuts a water line on the upper level of the CVC.  In the background is the central staircase connection the CVC to the Capitol.  Escalators will flank either side of the staircase.
    Architect of the Capitol | Washington, DC 20515
    Home | Contact AOC | Privacy Statement