Related Links
 
  •  
  •  
     
  •  
  •  
     
     
     
     
    More Locations
     
    Congressional Auditorium
    East Capitol Street
    East Front Extension
    Entrance
    Exhibition Gallery
    Food Service Area
    Great Hall
    LOC Tunnel
    Orientation Theater
    Plaza
    Service Level
    Skylights
    Photos of the CVC Entrance Construction
     
    On a tour with Senator Michael Enzi and his wife, Architect of the Capitol Alan Hantman (right) points out the view of the Capitol that will greet visitors just before they enter the north side CVC entrance
    2-21-05 On a tour with Senator Michael Enzi (R-WY) and his wife, Architect of the Capitol Alan Hantman (right) points out the view of the Capitol that will greet visitors just before they enter the north CVC entrance.
    The north retaining wall near the entrance of the CVC stands ready to begin receiving granite stone blocks from a quarry in Culpeper, VA
    4-25-05  The north retaining wall near the entrance of the CVC stands ready to begin receiving granite stone blocks from a quarry in Culpeper, VA.
    Workers begin installing the granite stone retaining wall
    5-2-05 Workers begin installing the granite stone retaining wall with a full view of the Capitol dome in the background.
    Stone masons continue installing granite on the north retaining wall
    6-6-05 Stone masons continue installing granite on the north retaining wall.
    A worker sets dowels in the steps near the north entrance to the CVC
    7-11-05 A worker sets dowels in the steps near the north entrance to the CVC.  The dowels will help support and anchor the granite blocks that will be positioned on the steps.
    Stone masons set a granite block in place along the north wall of the Congressional Auditorium
    7-25-05 Stone masons set a granite block in place along the north wall of the Congressional Auditorium, in view of the CVC entrance (right).
      Contact Us