    Photos of the CVC Service Level Construction
     
    A maze of ductwork occupies much of the overhead space in the CVC service level
    2-14-05 A maze of ductwork occupies much of the overhead space in the CVC service level.
    Large return fans, part of the CVC air handling system, are currently being installed in the service level
    3-14-05 Large return fans, part of the CVC air handling system, are currently being installed in the service level.
    Sheet metal workers position a large section of duct into place on the CVC service level
    7-25-05 Sheet metal workers position a large section of duct into place on the CVC service level.
    Workers secure a large fan unit to the floor of the CVC service level
    10-17-05 Workers secure a large fan unit to the floor of the CVC service level.

     