Architect of the Capitol | U.S. Capitol Building
Published on Architect of the Capitol | U.S. Capitol Building (http://www.aoc.gov)

Home >

Cannon Balustrade Project

Image: 
Cannon House Office Building
Status: 
Ongoing
Building: 
House Office Buildings

The Architect of the Capitol is currently repairing the Cannon House Office Building’s balustrade after discovering damage to some of the stones. After the stone was removed, craftsmen installed stainless steel rods into the stone and epoxied it together before resetting it in its original place. Additionally, the team is cutting out the old sealant and caulking between the balustrade wall to preserve the stone and fix any deficiencies in the caulking. This is a difficult task to perform as half of the work is on the outside portions of the roof on a three-foot...

U.S. Botanic Garden Terrace Garden Improvements

Image: 
Construction at the U.S. Botanic Garden Terrace
Status: 
Ongoing
Building: 
U.S. Botanic Garden

Beginning February 25, 2013, construction work will occur in the U.S. Botanic Garden Conservatory front landscape. A monumental urn will be installed in the central bed of the Terrace gardens, and site work around the urn will connect this bed with previous terrace improvements. The urn will be made of cast aluminum, and is scheduled to arrive in April. The final project will be completed in May. Signage will direct visitors around the work to the main Conservatory entrance which will remain open during the work.

Rosa Parks Statue Unveiling Ceremony

Event Date: February 27, 2013 11:00AM

This event has already occurred — House Speaker John Boehner (R-OH), Senate Majority Leader Harry Reid (D-NV), Senate Republican Leader Mitch McConnell (R-KY), and House Democratic Leader Nancy Pelosi (D-CA) will dedicate a statue of the late Rosa L. Parks at a ceremony to be held on Wednesday, February 27 in National Statuary Hall of the United States Capitol.
...

Rosa Parks Statue Joins U.S. Capitol Art Collection

On February 27, 2013, a statue of Rosa Parks will be joining the U.S. Capitol Art Collection following an unveiling ceremony that day.

Our Blog

America’s Greatest Engineer?

Posted on February 20
By: Matt Guilfoyle

Senate Reception Area Conservation

Image: 
AOC masons work in the Senate Reception Area of the Brumidi Corridors in advance of mural restoration that will be performed in February 2013.
Status: 
Ongoing
Building: 
United States Capitol

Beginning in February 2013, the murals in the Senate Reception Area of the Brumidi Corridors will be under restoration for at least eight months. Scaffolding will be in place for the work on the ceiling until late summer 2013, but the space will remain accessible. The ceiling and lunettes in this area will be restored through a combination of conservation and of replication in areas where it is not feasible to remove the overpaint without losing the original. The vertical wall panels will be conserved to reveal the original layer and the remaining walls will be...

Our Blog

Love at the Ford Building

Posted on February 14
By: Michael McDonald

Our Blog

Supporting the State of the Union

Posted on February 08
By: Stephen T. Ayers

Our Blog

Meeting Jason Baltimore

Posted on February 04
By: Kristen Frederick

Colors of Capitol Hill

After a winter of gray skies and leafless trees, the AOC Capitol Grounds crew never fails to wow visitors and staff with a kaleidoscope of flowers that, come spring, burst into bloom around the Capitol.

...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »

Source URL: http://www.aoc.gov/home?page=2