Featured

U.S. Capitol Dome was constructed with 8,909,200 pounds of ironwork bolted together in a masterpiece of American will and ingenuity.
The U.S. Capitol’s dome made of cast iron was designed by Thomas U. Walter and...

Featured

Featured

Painted portrait of Dr. William Thornton
The Architect of the Capitol (AOC) is the builder and steward of America’s...

Featured

Photo of a Roots and Reflections tour at the U.S. Botanic Garden.
The U.S. Botanic Garden is committed to welcoming every visitor by providing...

What's New

Dome Restoration Project Mobilization

West Front Staging Area

In support of the Dome Restoration Project trucks deliver equipment and supplies to the East and West Fronts of the U.S. Capitol between 6 a.m. and 3 p.m. Flagmen direct pedestrians to use the sidewalk during the delivery process for safety. Additionally, a staging area has been established on the northwest lawn of the U.S. Capitol for the duration of the project.
 
The plan below shows the truck route (red), the pedestrian route during deliveries (blue) and the staging area (yellow).

Dome Restoration Project Pedestrian Map

Building: 
Capitol Grounds
Status: 
Ongoing
Is a Video: 
0